| Company |
Project Title
|
| Anadolujet |
Revenue Management Departments Project |
| Beğendik |
Production Planning Based on Demand Forecasting |
| BTA Unlu Mamüller |
Capacity Assessment and Usage-Based Production Planning System |
| Delphi Otomotiv |
Improvement in the Lean Manufacturing System of the Cutting Department |
| Durukan Şekerleme |
Improvement in Raw Material Storage and Supply |
| Efes Pilsen |
Optimal Production Scheduling |
| FNSS Savunma Sistemleri |
Integration of the Production and the Materials Departments |
| İpek Kağıt |
Improvement of the Domestic Logistics System Through Regional Warehouses |
| İş Bankası |
Decision Support System for ATM Allocations |
| İş Bankası |
Improvement of the Cash Management System |
| Küçükpazarlı Havacılık |
Production Quality Control System Design |
| KSB Pompa Armatür |
Warehouse Layout Planning and Motor Location Arrangement in the New Assembly Shop |
| Oyak Renault |
K Motor Shop AGV Project |
| Silverline |
Transition to Lean Manufacturing in the Plastic Injection Shop |
| Tüpraş Aliağa |
Inventory Management System Design |
| Tüpraş İzmit |
Improvement in the Land Oil Filling Unit |
| Unilever |
Reduction in Lost Sales Due to Delays in Meeting the Customer Demand |